Gılgamış provided unprocessed river rock gravel and lime stone per a IDIQ (indefinite quantity indefinite delivery contract) contract under M20133‐08‐A‐A013 at Al Asad Base.
Construction Flight Line‐C5 – W912ER‐07‐C‐003
Gılgamış provided general contractor works to USACE for the construction and repair of the Flight Line C5 at Al Asad Base, 2008.
Perimeter Fence-62460
Gılgamış provided the construction of perimeter fence for the Al Asad Base under a contract issued by U.S. Military in Iraq, 2008
Heavy Equipment Rental-A8YM‐VC‐JB0011472
Gılgamış executed A8YM‐VC‐JB0011472 and A8YM‐VC‐JB0011473 for the rental heavy equipment. The contract was consisting of the lease of the heavy equipment as well as providing the operators with maintenance services.
LGSU Camp Baghdadi
The project consisted of the site adaptation and construction for the LGSU For Ia 2nd Brigade Support Camp Baghdadi. At the moment, the installation is located at Al Asad Airbase, located about 100 miles (160 km) west of Baghdad with a perimeter of more than 15 miles (24 km), and is the second largest USAF base in Iraq. The constructed buildings have been utilized as the home for the 2nd Marine Expeditionary Force (MEF). Other majör tenants have included the 82nd Airborne Division Advise & Assist Brigade, 321st Sustainment Brigade, VOD-1,[1] VAQ-
142, Navy Customs Battalion Juliet, elements of the Iraqi Army’s 7th Division, and the United States Air Force (USAF). The camp installation is comprimising of 250,000 square meters. Possesing facilities at Al Asad Airbase including batch plants, testing laboratories and gravel processing facilities in addition to the construction machinery, Gilgamis Group was prompt to response to the majority of the materials and construction machinery with an inhouse capacity. Though the envrionment was challenging during the Operation Iraq Freedom, Gilgamis Group proved its skills in logistics to feed the other material requirement with a sourcing capability from the neighbouring countries as well as USA. Furthermore, Gilgamis Group supported the project with a temporary labor camp meeting the standards including living units, ablution and sanitary facilities, etc…
The scope included management, planning, design, material, labor and equipment necessary to construct all utilities, road infrastructure and paving, buildings, force protection measures, site security, mine clearance activities and all other features as required to provide a completed and useable facility (Commercial and Instutional Housing Construction-NAICS code 236220). Site work and design to include, standard construction amenities such as underground utilities, site grading, electrical, communications infrastructure, detailing etc. was accomplished by Gilgamis Group. The work within this contract was performed in accordance with current U.S. design and International Building Codes (IBC), Life Safety Codes (NFPA-101), UFC 4-010-01, DoD Minimum Anti-Terrorism Standards for Buildings.
Blanket Purchase-Concrete Defence Barriers-
Gılgamış provided Alaska Barrier, Bunker, Concrete, Jersey Barrier, Security Barriers, Supply, T-Wall, Texas Barrier and Scud Bunkers under M20133‐06‐A‐1144 in Iraq, 2008
LGSU CAMP MAJIED-FA8903‐03‐D‐8677
The project consisted of the site adaptation and construction for the LGSU CAMP MAJIED AL ASAD IRAQ.At the moment, the installation is located within the region of Al Asad Airbase, located about 100 miles (160 km) west of Baghdad with a perimeter of more than 15 miles (24 km), and is the second largest USAF base in Iraq. The constructed buildings have been utilized as the home for the 2nd Marine Expeditionary Force (MEF). Other major tenants have included the 82nd Airborne Division Advise & Assist Brigade, 321st Sustainment Brigade, VOD-1,[1] VAQ- 142, Navy Customs Battalion Juliet, elements of the Iraqi Army’s 7th Division, and the United States Air Force (USAF). The camp installation is comprimising of 300,000 square meters.
As the project was located at Al Asad Airbase, Gilgamis Group gained the advantage of its facilities including batch plants, testing laboratories and gravel processing facilities in addition to the construction machinery, Gilgamis Group was prompt to response to the majority of the materials and construction machinery with an inhouse capacity. Though the envrionment was challenging during the Operation Iraq Freedom, Gilgamis Group proved its skills in logistics to feed the other material requirements with a sourcing capability from the neighbouring countries as well as USA.
Furthermore, Gilgamis Group supported the project with a temporary labor camp meeting the standards including living units, ablution and sanitary facilities, etc…
The scope included management, planning, design, material, labor and equipment necessary to construct all utilities, road infrastructure and paving, buildings, force protection measures, site security, mine clearance activities and all other features as required to provide a completed and useable facility (Commercial and Instutional Housing Construction-NAICS code 236220). Site work and design to include, standard construction amenities such as underground utilities, site grading, electrical, communications infrastructure, detailing etc. was accomplished by Gilgamis Group. The work within this contract was performed in accordance with current U.S. design and International Building Codes (IBC), Life Safety Codes (NFPA-101), UFC 4-010-01, DoD Minimum Anti-Terrorism Standards for Buildings.
Water Grid Operation-Maintenance M68450‐06‐M‐4124
Gılgamış provided operation& maintenance of water distribution grid including pumps, valves, tanks & otherequipments for U.S. Forces in Iraq.
Concrete Defense Barriers- M68450‐06‐A‐1144
Gılgamış provided the construction and installation of of Concrete Defense Barriers including Texas Barriers, Alaska Barriers, Jersey Barriers and Security Bunkers to the coalition forces located at Al Asad Base in 2006 in Iraq.
O&M Water Treatment Plant M68450‐08‐Q‐0149
Gılgamış provided the operation and maintenance of the water treatment facility at Al Asad Base in Iraq in 2008.










