LGSU Camp Baghdadi

The project consisted of the site adaptation and construction for the LGSU For Ia 2nd Brigade Support Camp Baghdadi. At the moment, the installation is located at Al Asad Airbase, located about 100 miles (160 km) west of Baghdad with a perimeter of more than 15 miles (24 km), and is the second largest USAF base in Iraq. The constructed buildings have been utilized as the home for the 2nd Marine Expeditionary Force (MEF). Other majör tenants have included the 82nd Airborne Division Advise & Assist Brigade, 321st Sustainment Brigade, VOD-1,[1] VAQ-

142, Navy Customs Battalion Juliet, elements of the Iraqi Army’s 7th Division, and the United States Air Force (USAF). The camp installation is comprimising of 250,000 square meters. Possesing facilities at Al Asad Airbase including batch plants, testing laboratories and gravel processing facilities in addition to the construction machinery, Gilgamis Group was prompt to response to the majority of the materials and construction machinery with an inhouse capacity. Though the envrionment was challenging during the Operation Iraq Freedom, Gilgamis Group proved its skills in logistics to feed the other material requirement with a sourcing capability from the neighbouring countries as well as USA. Furthermore, Gilgamis Group supported the project with a temporary labor camp meeting the standards including living units, ablution and sanitary facilities, etc…

The scope included management, planning, design, material, labor and equipment necessary to construct all utilities, road infrastructure and paving, buildings, force protection measures, site security, mine clearance activities and all other features as required to provide a completed and useable facility (Commercial and Instutional Housing Construction-NAICS code 236220). Site work and design to include, standard construction amenities such as underground utilities, site grading, electrical, communications infrastructure, detailing etc. was accomplished by Gilgamis Group. The work within this contract was performed in accordance with current U.S. design and International Building Codes (IBC), Life Safety Codes (NFPA-101), UFC 4-010-01, DoD Minimum Anti-Terrorism Standards for Buildings.

LGSU CAMP MAJIED-FA8903‐03‐D‐8677

The project consisted of the site adaptation and construction for the LGSU CAMP MAJIED AL ASAD IRAQ.At the moment, the installation is located within the region of Al Asad Airbase, located about 100 miles (160 km) west of Baghdad with a perimeter of more than 15 miles (24 km), and is the second largest USAF base in Iraq. The constructed buildings have been utilized as the home for the 2nd Marine Expeditionary Force (MEF). Other major tenants have included the 82nd Airborne Division Advise & Assist Brigade, 321st Sustainment Brigade, VOD-1,[1] VAQ- 142, Navy Customs Battalion Juliet, elements of the Iraqi Army’s 7th Division, and the United States Air Force (USAF). The camp installation is comprimising of 300,000 square meters.

As the project was located at Al Asad Airbase, Gilgamis Group gained the advantage of its facilities including batch plants, testing laboratories and gravel processing facilities in addition to the construction machinery, Gilgamis Group was prompt to response to the majority of the materials and construction machinery with an inhouse capacity. Though the envrionment was challenging during the Operation Iraq Freedom, Gilgamis Group proved its skills in logistics to feed the other material requirements with a sourcing capability from the neighbouring countries as well as USA.

Furthermore, Gilgamis Group supported the project with a temporary labor camp meeting the standards including living units, ablution and sanitary facilities, etc…

The scope included management, planning, design, material, labor and equipment necessary to construct all utilities, road infrastructure and paving, buildings, force protection measures, site security, mine clearance activities and all other features as required to provide a completed and useable facility (Commercial and Instutional Housing Construction-NAICS code 236220). Site work and design to include, standard construction amenities such as underground utilities, site grading, electrical, communications infrastructure, detailing etc. was accomplished by Gilgamis Group. The work within this contract was performed in accordance with current U.S. design and International Building Codes (IBC), Life Safety Codes (NFPA-101), UFC 4-010-01, DoD Minimum Anti-Terrorism Standards for Buildings.

Military Construction Projects Iraq-FA8903‐04‐D‐8672

This work includes the contracting works for the construction of office headquarters, command control facility, militaryclassrooms, billeting, general’s quarters and including the maintenance shop and other utilities including HVAC systems, installation and duct work, fire protection utilities and all electrical works.maintenance shop. Work included new construction and partial demolition of interior doors and relocation of existing spaces; mechanical work included HVAC systems repair and installation of new duct work; fire protection work included modification of existing wet pipe system if any; electrical work includes removal and replacement of existing lighting, receptacles, conduit, etc and various telecom cabling changes to meet new standards through out the existing structures as well. . Antiterrorism/Force protection measures and sustainment mandates were incorporated with the work commenced.

Construction Materials Supplies

The contract was issued by U.S. Military at Camp Al Asad in 2003 and Gılgamış was interested in fullfilling the requirement for the purchase and delivery of commercial construction supplies and equipment items. All items were delivered successfully in support of U.S. Military during Operation Iraq Freedom.